Streetsville GO Station-Parking Lot Expansion

Project Info
  • Construction Date: 5 November 2018
  • Location: 45 Thomas Street, Mississauga,
  • Values: $5.4 Million
  • Category: Completed, Parking Lot & Bus Stations
  • Client : Metrolinx
Project Details

Scope of this project Includes Site Construction Asphalt, Concrete Excavation Manholes, Catch Basin Concrete Curbs, Walks Top Soil, Grading Sodding Fertilization Electrical Masonry

More Project Details

Scope of this project Includes

  • Site Construction
  • Asphalt, Concrete
  • Excavation
  • Manholes, Catch Basin
  • Concrete Curbs, Walks
  • Top Soil, Grading
  • Sodding
  • Fertilization
  • Electrical
  • Masonry