Neshama Playground

Project Info
  • Construction Date: June 30, 2011
  • Location: 201 Oriole Pkwy, Toronto
  • Values: $ 1,349,960.01
  • Category: Completed, Parks & Community Centers
  • Client : City of Toronto
Project Details

Scope of the project involves Demolition of existing playground and washroom building.   Construction of new all-inclusive playground with splash pad and new washroom pavilion. Grading, excavating, storm sewers, sanitary sewers, watermain, water meter chambers, splash pads, irrigation system, mechanical works and connection to splash pad. Electrical piping & wiring, new poles and fixtures. Decorative […]

More Project Details

Scope of the project involves

  • Demolition of existing playground and washroom building.
  •   Construction of new all-inclusive playground with splash pad and new washroom pavilion.
  • Grading, excavating, storm sewers, sanitary sewers, watermain, water meter chambers, splash pads, irrigation system, mechanical works and connection to splash pad.
  • Electrical piping & wiring, new poles and fixtures.
  • Decorative fencing, field fencing, and armourstone walls.
  • Plaza seat walls, sand play area, retaining walls
  • Trail Bridge with impressed coloured concrete.
  • Granular paving and different types of walkways, decorative unit paving, colour concrete paving, asphalt paving, including curbs and sidewalks.
  • Installation of junior and senior play equipment along with rubber safety surface.
  • Supply and installation of site furnishings.
  • Planting, sodding, chain link fence and landscaping etc.,