Project Info
- Construction Date: May 28 2020
- Location: Markham
- Values: 929651.00
- Category: Featured Projects, Parks & Community Centers
- Client : City of Markham
- Start Date : July 22, 2019
Project Details
Scope of this project Includes Excavation/ Import of Clean Fill – 14200 Sq.M Rough Grade- 550 Cu.M Load/ Haul Fine Grade Top Soil – 14200 Sq.M Chain Link Fence Storm Sewer Sizes Varying from 450 mm PVC, 375mm, 250mm Connecting 3 ManHoles & 7 Catch Basin& 1 DCB Gazebo -Shade Structure Weeping Tile/Drainage Line Asphalt […]
More Project Details
Scope of this project Includes
- Excavation/ Import of Clean Fill – 14200 Sq.M
- Rough Grade- 550 Cu.M
- Load/ Haul Fine Grade Top Soil – 14200 Sq.M
- Chain Link Fence
- Storm Sewer Sizes Varying from 450 mm PVC, 375mm, 250mm Connecting 3 ManHoles & 7 Catch Basin& 1 DCB
- Gazebo -Shade Structure
- Weeping Tile/Drainage Line
- Asphalt Paving -1260 Sq.M
- Concrete Paving & Curbs
- Play Ground Equipment
- Engineered Wood Fiber
- Rubber Wear Mats
- Site Furniture- Bike Racks, Picnic Tables, Benches, Accessible Picnic Tables
- Tree Planting, Sodding