- Construction Date: March 2020
- Location: Brock Rd, Pickering
- Values: 352,797.30
- Category: Featured Projects, Parks & Community Centers
- Client : City of Pickering
Project Details
Scope of this Project Includes Excavation Asphalt Concrete Pad- Shade Structure Concrete Footing for Shade Structure Drainage Pipe Trees Challenges: While Digging the Holes for footings the earth profile is not the same as Geo-Technical (No Stiff Soil) report so didn’t support the design which was given during tender submission. Solution: Proposed Helical Piers […]
More Project Details
Scope of this Project Includes
- Excavation
- Asphalt
- Concrete Pad- Shade Structure
- Concrete Footing for Shade Structure
- Drainage Pipe
- Trees
Challenges: While Digging the Holes for footings the earth profile is not the same as Geo-Technical (No Stiff Soil) report so didn’t support the design which was given during tender submission.
Solution: Proposed Helical Piers for the footings Obtained design from Techno Metal Post and a Change order has been approved.